Now showing items 1-2 of 2

    • Ehlers, Gary A.; Haaland, Kurt (Texas A&M University. Turbomachinery Laboratories, 2010)
      A 10,000 psi high pressure natural gas injection compressor train was procured, manufactured, tested and installed in the Boquerón production facility in Eastern Venezuela. The injection machinery consisted of three (3) ...
    • Ehlers, Gary A. (Texas A&M University. Turbomachinery Laboratories, 1994)
      One of the primary functions of the rotating machinery engineer is the application and selection of turbomachinery. During the early stages of a project, the process engineer needs to know the performance of turbomachinery, ...